Nuclear / Power Generation

Startup · standby · turbine warming · deaeration

Nuclear and power generation facilities need reliable auxiliary steam for startup, standby, turbine warming, deaeration, equipment heating, and other plant support needs.

Industry Overview

Nuclear and power generation facilities need reliable auxiliary steam for startup, standby, turbine warming, deaeration, equipment heating, and other plant support needs.

 
Fast Response

ZETA boilers can be online in approximately 30–60 seconds from standby and modulate from 3–100% to match changing steam or hot-water demand.

High-Purity Dry Steam

ZETA boilers deliver steam quality above 99.8%, limiting moisture carryover for effective heat transfer, while maintaining less than 5 ppb sodium to help minimize corrosion within the steam system.

Flexible Capacity

ZETA boilers consume less than 50 kW in warm standby and generate no heat until called into operation. This helps reduce explosion risk while keeping auxiliary, backup, or supplemental capacity readily available.

References

Company

Haiyang Nuclear Power Plant

Type

Steam Boiler
Capacity
2 × 28 MW
Pressure Certifications
To be confirmed — no specific pressure certifications are listed in the brochure.
Electrical Certifications
To be confirmed — no specific electrical certifications are listed in the brochure.

Notes

Nuclear power plant / auxiliary steam
Estimated CO₂e Reduction
10.1 tonnes per operating hour

Haiyang Nuclear Power Plant is a reference where auxiliary steam is required to support plant operations outside the main steam cycle and ZETA electric steam boilers supports plant support needs when the main steam system is not operating.

The Haiyang reference includes two ZETA electric steam boilers at 28 MW each, for a total auxiliary steam capacity of 56 MW.

Additional References